Chilled Water Plant and Campus Distribution
Saint Mary’s School

  • Project Complete

    2007
  • Construction Cost

    $ 1.6 M

Following a master plan study, this project replaces the entire campus chilled water infrastructure system with a new chiller plant (825-ton design), campus distribution loop (3,000 LF), and new bridge piping for connections to each building. Chillers, cooling towers, and piping are all carefully integrated to avoid disruption on campus and meet strict historic neighborhood guidelines.