Portfolio

RADIOLOGY & ONCOLOGY
Onslow Memorial Hospital

  • New

    10,000 SF
  • Project Complete

    2010
  • Construction Cost

    $3.8M

This new standalone Radiology Oncology Pavilion is connected to the main hospital.  Feature spaces include a Linear Accelerator, Simulator, control rooms, mold room, dosimitry area, exam rooms, nurse’s stations, linen rooms, offices and conference rooms.

The fire sprinkler system is wet-pipe with pre-action provisions for the linear accelerator and simulator rooms.  HVAC is provided by a rooftop system with 14 VAV terminals, each with hot water reheat.  Centralized hospital systems (steam and chilled water) are extended to this building.  Packaged chillers provide process chilled water for the Linear Accelerator.  A DDC control system links HVAC operation to the main hospital.  Electrical system design includes interior lighting, power, nurse call, public address, patient camera monitoring and telephone/data.  Special attention has also given to the electrical power/control requirements of the Linear Accelerator and Simulator.