Duke Raleigh Hospital

  • Project Complete

    2004
  • Construction Cost

    $2M

This project was designed and installed to serve the entire hospital with no downtime as a result of the construction.  A temporary generator system was designed to facilitate this process.  Final upgrades included: new 6000A parallel switchgear, (2) 2000kw diesel generators, automatic transfer switches and a new switchboard.