CAMPUS PRIMARY ELECTRICAL SYSTEM
NC Central University

  • Project Complete

    2005
  • Construction Cost

    $2.2M

Begun as a campus electrical primary infrastructure study, this project upgraded the entire primary electrical distribution system on the 115-acre campus including replacement of transformers, cables, and switchgear.  The system was also expanded in order to serve various new campus facilities.  Two independent primary loops were designed with electronic monitoring at each campus switch such that system failures and subsequent downtime can be minimized.